top of page

Create Your First Project

Start adding your projects to your portfolio. Click on "Manage Projects" to get started

Government Tank Storm Drain

Date

2022 - 2025

Location

Flagstaff, AZ

Remal designed a 10-foot diameter storm drain that runs for nearly 3,000 linear feet. Water is conveyed from the Government Tank Watershed on the San Francisco Peaks, under Switchback Road & Highway 89N. After crossing the highway, the storm drain continues for 1,300 more feet, then discharges into the detention basin. As part of the overall design, Remal had to design the storm drain highway crossing under 89N. The highway crossing section of the storm drain consists of 1-inch-thick steel casing. The steel casings are connected to the SRMP storm drain, upstream and downstream, with 5-foot-wide concrete collars. This part of the construction process was the first jack-and-bore for this size of storm drain under an ADOT maintained road, in the state!
Pictures below show the storm drain during different phases of construction!

PHONE

928.419.4598

EMAIL

admin@remalconsulting.com

REMAL CONSULTING ENGINEERS
COPYRIGHT 2026

ADDRESS
1924 N Center St
Flagstaff, Arizona 86004

  • Instagram
  • LinkedIn
bottom of page