top of page

Create Your First Project

Start adding your projects to your portfolio. Click on "Manage Projects" to get started

Boy Scout Camp Barn Addition

Remal designed an onsite wastewater system that includes a septic tank and disposal trench for barn addition to this site. This septic system was designed based on soil characteristics and increased flow rates. Since there was no limiting layer in the soil, a disposal trench was appropriate.

PHONE

928.224.9003

EMAIL

admin@remalconsulting.com

REMAL CONSULTING ENGINEERS
COPYRIGHT 2025

  • Instagram
  • LinkedIn

ADDRESS
1924 N Center St
Flagstaff, Arizona 86004

bottom of page